01 — FAQ

Frequently asked questions

  • 01
    How long does a Frest home take?

    It depends on the project. Design and permitting after the design contract take from 12 weeks to six months; construction from 24 weeks to a year. The factory kit and assembly take 16–20 weeks of that, because the panels are produced while the foundations are built. Every project is a little different, and the exact schedule is agreed together with the offer.

  • 02
    What is in the Base and Complete packages?

    The Base package is the factory kit with assembly: insulated wall panels, roof, windows, exterior doors and a finished facade. The Complete package adds interior finishing, electrical, plumbing and heating. Neither package includes foundation works, land or the building permit.

  • 03
    Can the layout be changed?

    Yes. Standard models let you choose finishes, facade colour and roof type, and make layout changes — moving walls or adding modules. For a fully unique home we offer custom design.

  • 04
    How energy-efficient are the houses?

    The Als series has energy class A: 290–300 mm of wall insulation, 250–300 mm in the roof, 250 mm under the slab and triple glazing. Als 70 has calculated heating costs of €280–430 per year.

  • 05
    How do I see prices and configure a house?

    Register for the catalogue — it holds the full specification with a price for every option, a configurator with a running total, and a way to send your choice to the Frest team.

  • 06
    Does Frest build outside Latvia?

    Yes. Homes have been built in Denmark (Kettingskov, Stiklingen) and Latvia; the Als series was created for the Danish market and adapted to the Baltic climate.

02 — How it works

Five steps from conversation to keys.

Five steps from the first conversation to the keys.

01
Consultation

We discuss the plot, your family’s needs and the budget, and recommend a model and specification.

02
Offer and configuration

Registered clients configure the house with prices in the catalogue and receive a detailed offer.

03
Design and permit

Site plan, topography, geotechnical survey and building permit.

04
Factory production

Wall and roof panels are produced indoors with millimetre precision.

05
Assembly and keys

Assembly on site in days, then interior works, services and handover with an acceptance report.

The factory kit on site
The factory kit on site

A wall panel on its way from the truck to the slab — the factory kit on site.

Panel assembly · Kettingskov
Panel assembly · Kettingskov

Factory-built wall panels craned into place — one house in a few days.